SCADA & Monitoring System for 34 Solar Power Plants

Share the project on:

Project Description

As a specialized and leading contractor in the field of power industry automation, monitoring, and dispatching, Tabesh Pajoohan Sanat (TPS) company, relying on its indigenous knowledge and advanced technologies, has successfully designed, supplied, and implemented an integrated monitoring and control system for 34 solar power plants under the Renewable Energy and Energy Efficiency Organization (SATBA) across the country.

This major national project has been successfully executed in 4 provinces of the country with the aim of stable and secure data collection from field equipment, intelligent information flow management at the site level, monitoring of power quality parameters, and ensuring the secure and efficient integration of these power plants into the national power grid.

Key Project Features

  • Strategic Goal: Creating a centralized monitoring and control platform, enhancing operational visibility for clients over the clean energy production process, guaranteeing uninterrupted data exchange, and fully complying with national dispatching and SATBA requirements and standards.
  • Indigenous Products and Tools Used:
  • SCADATech Indigenous SCADA System: A powerful monitoring and industrial data management platform developed by TPS for system integration and real-time display of power plant stability status.
  • PNI-400 Time Server: An indigenous time server produced by TPS for precise time synchronization of power plant equipment.

Specifications and Capacities of the 34 Covered Power Plant Sites

This large-scale project covers a collection of solar power plants with various capacities across different regions of the country:

1. Alborz Province (Total Capacity: 72 MW)

  • Eshtehard 1 Power Plant: 24 MW
  • Eshtehard 2 Power Plant: 12 MW
  • Omid Alborz 1 Power Plant: 18 MW
  • Omid Alborz 2 Power Plant: 12 MW
  • East Kowsar 2 Power Plant: 6 MW

2. Qazvin Province (Total Capacity: 36 MW)

  • Jafarabad Power Plant: 12 MW
  • Akbarlar Power Plant: 6 MW
  • Papol Olya Power Plant: 6 MW
  • Karimank Power Plant: 6 MW
  • Ghasemabad Power Plant: 6 MW

3. Electric Isfahan Province (Total Capacity: 75 MW)

  • Ardestan Power Plants (Including 12 sites: 1, 2, 4, 7, 10, 11, 15, 17, 18, 20, 22, 24): 3 MW each (Total of 36 MW)
  • Golpayegan Power Plants (Including 4 sites: 1, 2, 6, 12): 3 MW each (Total of 12 MW)
  • Kouhpayeh Power Plants (Including 3 sites: 1, 2, 3): 6 MW each (Total of 18 MW)
  • Nain Power Plants (Including 3 sites: 5, 20, 21): 3 MW each (Total of 9 MW)
  • Shahreza Power Plant: 3 MW

4. Qom Province (Total Capacity: 18 MW)

  • Salafchegan Power Plant: 18 MW

Implementation and Execution Stages

  1. System Integration: Designing and configuring a communication architecture resistant to environmental and industrial noise, tailored to the different climatic conditions of the sites.
  2. Design of Monitoring Interfaces: Creating user-friendly Human-Machine Interfaces (HMI) focused on the continuous monitoring of equipment performance efficiency and analysis of grid connection parameters.

Project Achievements and Results

  • Data Stability and Security: Secure and uninterrupted collection and logging of macro power plant data nationwide.
  • 100% Visibility: Enhancing monitoring and operational indicators for operators, technical teams, and esteemed clients.
  • Facilitating Grid Integration: Full compliance of the monitoring systems with sub-transmission and transmission dispatching requirements for the optimal utilization of injected power into the national grid.
  • Development and Localization: Continuing indigenous innovation and consolidating the position of Tabesh Pajoohan Sanat company as a technological and strategic partner of the country in renewable industries and smart energy management.