Visibility Project of the 5 MW Kerman Battery Power Plant

Implementation of the monitoring system for the 5 MW Kerman Battery Solar Power Plant by Tabesh Pajouhan Sanat, ensuring precise and optimized supervision.

Share the project on:

Project Execution:

Tabesh Pajouhan Sanat (TPS), as a specialized contractor, successfully executed the project of connecting the 5 MW solar power plant to the regional dispatching system. In this project, using an RTU, the transmission of data and the reception of control commands from the dispatching center were made possible, thereby connecting the power plant to the regional dispatching network.

Key Features of the Project

Objective: Ensuring stable and secure communication between the power plant and the regional dispatching system for optimized energy management.
Equipment Used: Industrial RTU configured by the TPS team.

Project Execution:

• Installation and commissioning of the RTU

• Connecting the RTU to the dispatching network and configuring communication protocols

• Full testing and commissioning of the system for real-time data exchange

Results:

• Enabling control and monitoring of the power plant through the regional dispatching center

• Secure and accurate exchange of operational information between the power plant and the power grid

• Improved operational coordination of the power plant with the national grid and enhanced energy efficiency

This project is an example of TPS’s capability in providing specialized solutions for connecting solar power plants to energy management systems and the electrical grid, representing an important step toward developing smart energy networks.